Our factory is located in Ialoveni district and we were quite often confronted with the problem of disconnecting the power, I think we had no electricity about 2 times a week and then we kept looking for solutions.
At the same time, the energy consumption is quite high, the bills reach up to 40-50 thousand lei per month, especially in the active months. Initially, we bought a generator that was not enough, after which we thought of a photovoltaic system, which would provide us with permanent electricity.
We have identified the possibility of accessing credit through the Moldovan Orchard. At the moment, everything is installed and working.